Method for the regulation of an installation for the geological sequestration of carbon dioxide, suitable for renewable energy supply

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12162699
APP PUB NO 20230009233A1
SERIAL NO

17863093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the regulation of an installation for the geological sequestration of carbon dioxide includes a structure; a CO2 storage compartment, received in said structure; a device for injecting CO2 into a geological reservoir; an energy production device; and an energy storage device. The energy production device supplies a power that varies over time, between low, intermediate, and high states. When the power supplied is in the low state, the injection device is powered by the energy storage device; and when said power supplied is in the high state, the injection device is powered by the power generation device, to ensure a continuous injection of CO2 into the geological reservoir.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNIP ENERGIES FRANCE92741 NANTERRE CEDEX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dechiron, Cyrille Courbevoie, FR 2 7
Heme, De Lacotte Luc Nanterre, FR 1 0
Lopez, Audrey Courbevoie, FR 1 0
Marcel, Fabrice Courbevoie, FR 3 0
Perdu, Gauthier Courbevoie, FR 10 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00