Power and control system for a loading dock assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12162705
APP PUB NO 20220306409A1
SERIAL NO

17702228

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dock apparatus includes a plurality of loading dock components. An identification system is coupled with the plurality of loading dock components. A control panel is in signal communication with the plurality of loading dock components via the identification system. The identification system automatically cooperates with the control panel to define an operating sequence of the plurality of loading dock components. A power module is in signal communication with the control panel and an installed component of the plurality of loading dock components. The control panel provides instructions to the power module according to the operating sequence and the power module delivers a predetermined electrical current to the installed components of the plurality of loading dock components in a sequential pattern defined by the operating sequence.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUE GIANT EQUIPMENT CORPOATION410 ADMIRAL BOULEVARD MISSISSAUGA L5T 2N6

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biasutto, Gerard Mississauga, CA 3 2
Scheffel, Trevor Mississauga, CA 1 0
Singh, Inderpreet Mississauga, CA 5 326

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00