Dodecyl sulfate-doped poly(3,4-ethylenedioxythiophene) film and manufacturing method therefor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12162999
APP PUB NO 20210317277A1
SERIAL NO

17284069

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Proposed are a dodecyl sulfate-doped PEDOT film and a manufacturing method therefor, the method including: coating, on a substrate, an oxidizing agent film including a dodecyl sulfate metal salt such as Fe(DS)3; and forming a PEDOT film by vapor phase polymerization. The dodecyl sulfate-doped PEDOT film according to the present disclosure has excellent electrical conductivity so as to be capable of replacing a metal, and has excellent mechanical durability, light transmittance, and aqueous solution stability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLEXOLUTION#2003 120 HEUNGDEOKJUNGANG-RO GIHEUNG-GU YONGIN-SI GYEONGGI-DO 16950

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Sung Soo Daejeon, KR 138 622
Lee, Jung Won Seoul, KR 111 788
Ma, Feng Daejeon, KR 34 308

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00