Process for producing synthetic fuel

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12163099
APP PUB NO 20230117862A1
SERIAL NO

17917940

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a process for the manufacture of a synthetic fuel comprising gasifying a carbonaceous feedstock comprising waste materials and/or biomass to generate a raw synthesis gas; supplying the raw synthesis gas to a primary clean-up zone to wash particulates and ammonia or HCl out of the raw synthesis gas; contacting the synthesis gas in a secondary clean-up zone with a physical solvent for sulphurous materials; contacting the desulphurised raw synthesis gas in a tertiary clean-up zone with a physical solvent for CO2 effective to absorb CO2; removing at least part of the absorbed CO2 in a solvent regeneration stage to recover CO2 in a form sufficiently pure for sequestration or other use; and supplying the clean synthesis gas to a further reaction train to generate a synthetic fuel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VELOCYS TECHNOLOGIES LIMITEDHARWELL OXFORDSHIRE OX11 0QG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deshmukh, Soumitra R Houston, US 12 8
Greager, Ivan Philip Houston, US 17 22
Harris, Roger Allen Houston, US 21 18
King, Neil Alexander Oxford, GB 13 12
Qiu, Zheyan Sugar Land, US 8 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00