Brake booster assembly and pushrod-pedal coupler

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12168429
APP PUB NO 20230093360A1
SERIAL NO

17478168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brake booster assembly having a brake booster body and a pushrod as well as a pushrod-pedal coupler are provided. The pushrod travels along a pushrod axis when being pushed. The brake booster assembly includes a pushrod-pedal coupler. The pushrod-pedal coupler comprises a pushrod-attachment end arranged on the pushrod and defining a longitudinal axis parallel to the pushrod axis. A pedal-attachment end is configured to be attached to a pedal and having a pedal pivot axis around which the pedal pivots when being pushed. The pedal pivot axis extends across the longitudinal axis. A coupler hinge is arranged between the pushrod-attachment end and the pedal-attachment end and connects the pushrod-attachment end with the pedal-attachment end. The coupler hinge has a coupler hinge axis that extends across the longitudinal axis and the pedal pivot axis. The pedal pivot axis and the coupler hinge axis are offset along the longitudinal axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHPOSTFACH 30 02 20 70442 STUTTGART GERMANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nelson, Kenneth Novi, US 12 398

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00