High-throughput additively manufactured power delivery vias and traces

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12170244
APP PUB NO 20210407903A1
SERIAL NO

16914062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit (IC) die package substrate comprises a first trace upon, or embedded within, a dielectric material. The first trace comprises a first metal and a first via coupled to the first trace. The first via comprises the first metal and a second trace upon, or embedded within, the dielectric material. A second via is coupled to the second trace, and at least one of the second trace or the second via comprises a second metal with a different microstructure or composition than the first metal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abou-Alfotouh, Ahmed Chandler, US 6 14
Braunisch, Henning Phoenix, US 157 1522
Choi, Beomseok Chandler, US 33 39
Dogiamis, Georgios Chandler, US 97 247
Eid, Feras Chandler, US 299 1201
Elsherbini, Adel Tempe, US 121 401
Lambert, William J Tempe, US 69 418
Morein, Stephen Chandler, US 64 503
Swan, Johanna Scottsdale, US 112 1299

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00