Chestnut picking system, a conveyor assembly for separating chestnuts and method of harvesting

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12171165
SERIAL NO

18613955

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nut picking system suitable for picking chestnuts having a gathering assembly, and a conveyor assembly. The gathering assembly has an intake and a mesh belt associated with the intake. The gathering assembly gathers chestnuts and burrs through the intake to from the mesh belt at the dispensing axle. The conveyor assembly includes a frame, bed rollers and a conveyor drive. The frame has a conveyor sides, a feed and discharge end. Each bed roller has a first end and a second end and outer surface. The bed rollers are rotatably coupled to the frame, and are spaced apart from each. The bed rollers include a plurality of spaced apart fingers extending outwardly from the outer surface and terminating in a tip. The fingers have a length that is greater than the bed roller spacing. The conveyor drive rotates the bed rollers. Methods are likewise disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEKLEINE HERBERT ARTHURSAN LUIS OBISPO CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DeKleine, Carl Grand Haven, US 1 0
DeKleine, Herbert Arthur San Luis Obispo, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00