Helium based emergency power and fire suppression system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12172760
APP PUB NO 20210331808A1
SERIAL NO

17367105

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a turbo pump that converts a compressed gas into power, and a storage tank configured to store the compressed gas. The system also includes a fire suppression control valve configured to be coupled between the storage tank and a cargo compartment of the aircraft and having a closed position in which the compressed gas fails to flow to the cargo compartment and an open position in which the compressed gas flows to the cargo compartment to suppress a fire. The system also includes a pump control valve configured to be coupled between the turbo pump and the storage tank and having a closed position in which the compressed gas fails to flow to the turbo pump and an open position in which the compressed gas flows to the turbo pump to cause the turbo pump to convert the compressed gas into the power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIDDE TECHNOLOGIES INC4200 AIRPORT DRIVE NW WILSON NC 27896

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Himmelmann, Richard A Beloit, US 169 1111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00