Combined reforming apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12172895
APP PUB NO 20230104475A1
SERIAL NO

17548574

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined reforming apparatus is provided. The combined reforming apparatus includes a body, a first catalyst tube disposed inside the body and reacting at a first temperature to reform hydrocarbons (CxHy) having two or more carbon atoms into methane (CH4), a second catalyst tube disposed inside the body, connected to the first catalyst tube, and reacting at a second temperature higher than the first temperature to reform methane (CH4) into synthesis gas comprising hydrogen (H2) and carbon monoxide (CO), a combustion unit configured to supply heat to the first and second catalyst tubes, a gas supply pipe configured to supply hydrocarbon gas to the first catalyst tube, a first steam supply pipe configured to supply steam to the first catalyst tube, and a second steam supply pipe configured to supply steam to the second catalyst tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTDSEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Bong Keun Yongin, KR 12 26
Nam, Gyeong Mo Yongin, KR 13 26
You, Su Nam Yongin, KR 7 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00