Methods and compositions for the surface treatment of ferrules and fibers for improved bonding of optical fibes within ferrules

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12174431
APP PUB NO 20230152532A1
SERIAL NO

17917875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a ferrule assembly. The ferrule assembly comprises a ferrule having an inner diameter surface. The ferrule assembly also comprises an adhesion promotor coating composition comprising an amine functionality, a glycidyl functionality, a thiol functionality, an oxirane functionality, or any combination thereof and a radical cure initiator. The ferrule assembly may further comprise an inorganic hydrolysable layer on the inner diameter surface. The ferrule assembly may also further comprise an adhesion promotor coating on the inorganic hydrolysable layer of a composition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMSCOPE TECHNOLOGIES LLC3642 E US HIGHWAY 70 CLAREMONT NC 28610

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Braun, Dennis Marvin Waconia, US 4 3
Drapeau, Richard J Victoria, US 6 828
Galla, Matthew Peter Holly Springs, US 8 8
Gottschalk, Peter Maplewood, US 19 1031

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00