Measurement tool for cable-preparation system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12176689
SERIAL NO

17757914

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques, systems and articles are described for preparing electrical cables for connections to a power grid. In one example, a cable-cross-section-measurement tool includes a housing defining a cavity, wherein the housing is configured to position an end-face of an electrical cable within the cavity; a camera disclosed within the cavity of the housing, wherein the camera is configured to capture an image of the end-face of the electrical cable; and a telecentric lens optically coupled to the camera, wherein the telecentric lens comprises a non-angular field of view configured to reduce, in the image, distortion from parallax associated with at least one portion of the end-face of the electrical cable that is oriented at an oblique angle relative to an optical axis of the telecentric lens.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONNECTED INTELLIGENCE SYSTEMS LTD4059300 NETANYA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bar-Ziv, Uri Zichron Yaakov, IL 12 8
Gundel, Douglas B Cedar Park, US 153 2152
Haritonov, Alexey Netanya, IL 1 0
Kaufman, Assaf Tal Shahar, IL 13 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00