Crushing device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12179213
APP PUB NO 20220314229A1
SERIAL NO

17608597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A deflection distributor refitting kit for a roller crusher. The deflection distributor refitting kit includes a deflection distributing shaft, thrust rods each having first and second ends and mounts for attachment of the deflection distributing shaft at a frame of the roller crusher. A first end of each of the thrust rods is attached to the deflection distributing shaft via a lever. A second end of each of the thrust rods is arranged to be attached to a movable bearing housing of the roller crusher. The deflection distributing shaft includes first and second shaft parts which are interconnected by means of a shock absorbing unit. A method for mounting the deflection distributor refitting kit, as well as a roller crusher including the deflection distributor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METSO OUTOTEC USA INC20965 CROSSROADS CIRCLE WAUKESHA WI 53186

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harbold, Keith York, US 14 10
Reznitchenko, Vadim Mechanicsburg, US 22 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00