Method of manufacturing staking assembly, method of manufacturing hub unit bearing, staking device, staking assembly, and method of manufacturing vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12179251
APP PUB NO 20220055089A1
SERIAL NO

17599712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An application position of a processing force directed radially outward is continuously changed in the circumferential direction of a cylindrical portion (25) while applying the processing force to a part of the cylindrical portion (25) of a hub main body (21) in the circumferential direction. An application position of a processing force directed radially inward is continuously changed in the circumferential direction of a staking portion intermediary body (41) while applying the processing force to a part of the staking portion intermediary body (41) in the circumferential direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NSK LTDSHINAGAWA-KU TOKYO 141-8560

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hagiwara, Nobuyuki Fujisawa, JP 50 178
Zhao, Xuexiao Fujisawa, JP 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00