Lamp device and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12179657
APP PUB NO 20240208403A1
SERIAL NO

18177013

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lamp device includes: an optical unit that is provided in a vehicle and irradiates light; a leveling unit configured to adjust an optical axis of the optical unit in a vertical direction; an object detection unit configured to detect an object around the vehicle to generate surrounding environment information; a driving condition determination unit configured to determine a driving condition of the vehicle; and a control unit configured to control the leveling unit, in which the control unit determines a projection surface of the optical unit based on the surrounding environment information and the driving condition and controls a projection distance of light by the leveling unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOBIS CO LTDGANGNAM-GU SEOUL 06141

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ryu, Chang Myung Hwaseong-si, KR 15 310

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00