Method for producing halide

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12180085
APP PUB NO 20230018638A1
SERIAL NO

17933097

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The production method of the present disclosure includes heat-treating a material mixture containing a compound containing Y, a compound containing Sm, NH4α, Liβ, and Caγ2 in an inert gas atmosphere. The compound containing Y is at least one selected from the group consisting of Y2O3 and Yδ3, and the compound containing Sm is at least one selected from the group consisting of Sm2O3 and Smε3. The material mixture contains at least one selected from the group consisting of Y2O3 and Sm2O3, and α, β, γ, δ, and ε are each independently at least one selected from the group consisting of F, Cl, Br, and I.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asano, Tetsuya Nara, JP 116 540
Kubo, Takashi Hyogo, JP 267 2077
Miyatake, Kazufumi Osaka, JP 40 30
Mizuno, Keita Aichi, JP 16 0
Sakai, Akihiro Nara, JP 147 588

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00