Skid steer loader

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12180671
APP PUB NO 20230018044A1
SERIAL NO

17782639

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A skid steer loader includes a chassis frame, a cab, a main beam, and a bucket. The chassis frame is assembled with a walking system to form a movable chassis of the skid steer loader, and a power system of the skid steer loader is assembled to a tail portion of the chassis frame. The cab is arranged on a front portion of the chassis frame in an. overturning manner, and the cab is horizontally placed on the chassis frame when a telescopic support rod is in a retracted state and overturns forward when the telescopic support rod is in an extended state. A tail end of the main beam is movably hinged to the tail portion of the chassis frame by a four-bar linkage mechanism, the bucket is assembled to a front end of the main beam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNWARD INTELLIGENT EQUIPMENT CO LTD410000 NO 1335 LAOTANG EAST ROAD CHANGSHA ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE HUNAN PROVINCE CHANGSHA CITY HUNAN PROVINCE 410000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gan, Zhengyu Changsha, CN 1 0
Hu, Huiwen Changsha, CN 1 0
Liu, Junyi Changsha, CN 43 260
Liu, Zhen Changsha, CN 414 5359
Tan, Zeping Changsha, CN 1 0
Xie, Xianghua Changsha, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00