Multi-functional connector

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12180697
APP PUB NO 20220243454A1
SERIAL NO

17625933

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly for offsite construction of a building, a connector for use in such an assembly, along with a method of manufacture of such a connector, and a method of construction using the assembly. The connector includes first and second buttress elements defining, respectively, a first location portion and a second location portion. The first location portion and the second location portion are configured, respectively, to receive first and second structural elements extending at transverse angles to each other. The first and second buttress elements each has first and second opposite side walls defining an access space between them for a connector to be accessed. The second side wall of the first buttress element and the second side wall of the second buttress element together define a third location portion configured to receive a third structural element extending transversely to the first and second structural elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MOONSHINE INVESTMENT HOLDINGS LIMITED; ELLIOTT GROUP LIMITED; MCAVOY GROUP LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clark, David Belfast, GB 167 2441
Cowell, James Worcester, GB 2 2
Crosby, Richard Wakefield, GB 4 57
Harvey, Martin Dungannon, GB 7 108
Hoggarth, Chris York, GB 2 2
Illingsworth, Anthony Peterborough, GB 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00