Laser measurement apparatus having a removable and replaceable beam dump

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12181337
APP PUB NO 20240167870A1
SERIAL NO

18410646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application discloses an apparatus and method configured to measure characteristics of high power beams of laser energy used in material processing. In one embodiment, the apparatus includes a housing having a first compartment and a second compartment separated from each other to reduce the transfer of thermal energy between them. Optical modules having optical sensors configured to measure characteristics of the high power beam are mounted in the first compartment. A removable and replaceable beam dump configured to absorb most of the high power beam is positioned in the second compartment. The removability/replaceability of the beam dump enables operation of the apparatus without active cooling of the beam dump assembly, simplifying the apparatus and protecting the optical sensors in the first compartment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OPHIR OPTRONICS SOLUTIONS LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sanilevici, Karol Jerusalem, IL 6 22
Superfin, Alexandr Keriyat Gat, IL 3 1
Zinoviev, Oleg Jerusalem, IL 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00