Polymer-based substrate and method for producing the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12186775
APP PUB NO 20200298272A1
SERIAL NO

16892849

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polymer-based substrate is proposed, which in particular is electrostatically coatable, wherein the substrate has a substrate base body made using a polymeric material and a two- or multi-layer coating applied to a surface region of the substrate base body, wherein a first layer of the coating is configured as a bonding layer and is arranged in contact with the surface region of the substrate base body, wherein a second layer of the coating is configured as a lacquerable cover layer, wherein at least one layer of the coating is produced as a layer with reduced surface resistance using a proportion of an electrically non-insulating material, such that it results in a specific surface resistance of this layer of about 1010 Ohm or less, and wherein at least one layer of the coating is configured as a film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENSINGER GMBH71154 NUFRINGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Möller, Michael Cham, DE 17 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00