Connector and forming method of connector

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12191612
APP PUB NO 20220385005A1
SERIAL NO

17717273

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector comprises an insert-molded body. The insert-molded body comprises a housing and a terminal partially embedded in the housing. The housing has a main portion. The main portion is formed with a trace hole and an accommodation space. The terminal has a held portion, a bent-back portion extending forward from the held portion, a support portion extending rearward from the bent-back portion and a contact portion supported by the support portion. The held portion has a wide portion. When the insert-molded body is seen from above, the wide portion is, at least in part, visible through the trace hole. Each of the support portion and the contact portion has a size smaller than that of the wide portion in the lateral direction. The wide portion is partially visible through the accommodation space when the insert-molded body is seen from below.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN AVIATION ELECTRONICS INDUSTRY LIMITEDTOKYO 150-0043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oosaka, Junji Tokyo, JP 73 351

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00