Hybrid power train structure in off-road vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12194856
APP PUB NO 20230202286A1
SERIAL NO

18111818

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid power train structure for off-road vehicles (ATVs, UTVs and SSVs) uses an internal combustion engine (“ICE”) rotating a crankshaft through a continuously variable transmission (“CVT”) as a primary source of locomotion torque, but also includes a driving/generator motor which, in certain established conditions, can either provide an additional or alternative source of locomotion torque or can harvest electricity from the torque created by the internal combustion engine. The driving/generator motor is an axial flux motor of small size for its relative torque output, which can either be directly coupled to the CVT output shaft or, when additionally used as a starter motor for the ICE in an automatic ICE starting and stopping routine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHEJIANG CFMOTO POWER CO LTDHANGZHOU ZHEJIANG 311100

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Jiajun Hangzhou, CN 30 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00