Systems of producing hydrogen and biochar from biomass assisted by iron and steel slag extract

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195334
APP PUB NO 20210380406A1
SERIAL NO

17334858

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems of producing hydrogen and biochar from biomass assisted by iron and steel slag extract include: a pretreatment system that the reactants, including the biomass, iron-based catalyst and alkaline reagent, are pretreated and fully mixed at specific ratios in the pretreatment system; thermal reactor that the mixed reactants from the pretreatment device are transferred into and fully reacted in the thermal reactor; a solid residue collector that the solid residue is collected by the solid residue collector at the discharge outlet of the thermal reactor after the reacted mixture is separated; a gas collection system that he generated hydrogen-based gas is collected by the gas collection system from the exhaust port of the thermal reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREENORE HOLDING COTHE CORPORATION TRUST COMPANY CORPORATION TRUST CENTER 1209 ORANGE STREET COUNTY OF NEW CASTLE WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhao, Huangjing Shanghai, CN 6 13
Zhou, Xiaozhou Shanghai, CN 12 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00