Sulfide solid electrolyte and treatment method therefor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12199236
APP PUB NO 20230223594A1
SERIAL NO

18184707

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sulfide solid electrolyte, which is able to adjust the morphology unavailable traditionally, or is readily adjusted so as to have a desired morphology, the sulfide solid electrolyte having a volume-based average particle diameter measured by laser diffraction particle size distribution measurement of 3 μm or more and a specific surface area measured by the BET method of 20 m2/g or more; and a method of treating a sulfide solid electrolyte including the sulfide solid electrolyte being subjected to at least one mechanical treatment selected from disintegration and granulation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IDEMITSU KOSAN CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayakawa, Takashi Chiba, JP 71 525
Iseki, Yusuke Chiba, JP 13 1
Kato, Koji Chiba, JP 226 2190
Nakaya, Nobuhito Ichihara, JP 11 1
Okuyama, Tomoyuki Ichihara, JP 51 260
Senga, Minoru Sodegaura, JP 53 565
Shibata, Masayuki Chiba, JP 62 237
Shimada, Shogo Ichihara, JP 11 14
Yamada, Hiroaki Chiba, JP 162 1130

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00