Heat dissipation for a photovoltaic junction box

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12199561
APP PUB NO 20230402967A1
SERIAL NO

18451337

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus of a junction box component housed in a junction box and designed to be coupled to a power generator. The junction box component may include one or more bypass mechanisms configured to bypass one or more substrings of the power generator in a case of malfunction or mismatch between the substring and the remainder of the power generators. The one or more bypass mechanisms may generate heat which may be transferred out of the junction box. The junction box component may be designed to conduct the heat towards the base of the junction box and/or the cover of the junction box. A heat dissipation mechanism may be mounted on the base and/or the cover. A bypass mechanism may bypass the entire power generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SOLAREDGE TECHNOLOGIES LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Galin, Yoav Ra'anana, IL 228 10000
Gazit, Meir Ashkelon, IL 123 5366
Ilani, Dan Tel Aviv, IL 4 5
Naor, Pomerantz Adi Tel Aviv, IL 5 0
Sella, Guy Bitan Aharon, IL 204 9615

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00