Engineered stone slab, and apparatus and method for creating

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12202288
APP PUB NO 20240391265A1
SERIAL NO

18200384

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Obtaining a reference image of a natural stone; producing a first engineered stone slab which approximates an aspect of the reference image of the natural stone; performing an examination of the first engineered stone slab; using the reference image and results of the examination, to create a first masking image; and printing the first masking image onto the first engineered stone slab. Producing a second engineered stone slab which approximates the aspect of the reference image of the natural stone, wherein the first and the second engineered stone slabs provide different approximations, as caused by random variation in a manufacturing process; performing an examination of the second engineered stone slab to obtain results; using the reference image and results of the examination of the second engineered stone slab, to create a second masking image; and printing the second masking image onto the second engineered stone slab.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Xie, Alex West Windsor, US 22 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00