Thermoplastic composition, electrical wire and article comprising the electrical wire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12202970
APP PUB NO 20210388202A1
SERIAL NO

17290832

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thermoplastic composition includes an aromatic poly(ketone), a poly(etherimide), and a reactive additive, wherein each component is present in a particular amount as defined herein. The thermoplastic composition can be useful in an insulating layer disposed over a conductor wire to form an electrical wire. Articles including the thermoplastic composition can be particularly useful in applications including an electrical device component, a railway vehicle component, an auto-mobile component, a marine vehicle component, a construction component, construction component, a building component, or an aircraft component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHPP GLOBAL TECHNOLOGIES B V4612 PX BERGEN OP ZOOM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Mian Shanghai, CN 11 5
Hayashi, Katsura Tokyo, JP 43 804
Kinoshita, Tsutomu Tokyo, JP 11 120
Mitsui, Kazuhiko Tokyo, JP 14 89
Ramalingam, Hariharan Bangalore, IN 24 96

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00