Construction equipment and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12203239
APP PUB NO 20210301495A1
SERIAL NO

17344850

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Construction equipment is provided that can include: a transport assembly operably supporting a platform, the platform having a leading edge opposing a rearward edge, the leading edge associated with a first direction of the transport assembly, and the rearward edge associated with a second direction of the transportation assembly; an operator cab above the platform and aligned closer to the leading edge than the rearward edge; an engine above the platform and aligned closer to the rearward edge than the leading edge; and a boom pivotably attached above the platform closer to the rearward edge than the leading edge, the boom being movable between a first position fully extended and a second position fully raised. Utility line pole placement and/or removal construction methods are provided that can include extending an extension assembly having a banana boom from a transport assembly to couple with a utility line pole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BUNTING NATHANRED BLUFF CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bunting, Nathan Red Bluff, US 6 19
Stephens, Nate Rathdrum, US 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00