Conductive resin composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12205731
APP PUB NO 20230343481A1
SERIAL NO

18346538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing an electronic component includes: a preparation step of preparing an electrode-forming body for electronic components; and an electrode forming step of forming an electrode on an outer surface of the electrode-forming body for electronic components, wherein in the electrode forming step, a conductive resin layer is formed on the electrode-forming body for electronic components by using a conductive resin composition containing a metal powder, a resin binder, and an organic solvent, wherein 20.0% by mass or more of the metal powder is a flaky metal powder, and 70.0% by mass or more of the resin binder is a silicone resin. According to the present invention, it is possible to provide a method for manufacturing an electronic component having reduced restrictions on design and manufacturing and high manufacturing efficiency, in addition to high moisture resistance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHOEI CHEMICAL INCTOKYO 163-0443

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Esaki, Soichiro Tosu, JP 6 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00