Material introduction lock for a distribution machine, and distribution machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12207587
APP PUB NO 20220095529A1
SERIAL NO

17425373

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A material introduction lock for a distribution machine for pneumatically conveying granular material in a conveying line adjoining a material introduction lock includes: an air inlet, a material conveying element, and a material infeed element, where a pneumatic conveying flow is supplied to the material conveying element via the air inlet, and the material infeed element is arranged between the material conveying element and the conveying line so that the granular material in the conveying line supplied via the material infeed element is conveyed in the conveying line by the pneumatic conveying flow supplied by the material conveying element. Further, the material infeed element includes a rinsing nozzle element which is connected to the air inlet and creates a film of air that sheathes the material infeed element from the inside, and the rinsing nozzle element is configured to reduce contact between the granular material and the material infeed element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMAZONEN-WERKE H DREYER SE & CO KG49205 HASBERGEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Luebben, Jan-Eike Edewecht, DE 4 4
Mertens, Daniel Oldenburg, DE 3 1
Wien, Thomas Stuhr, DE 23 185

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00