Hand bicycle pedal

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12208857
APP PUB NO 20220250712A1
SERIAL NO

17610459

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Hand pedals for turning the crank set of an arm driven tricycle have modular interchangeable components including a bearing which mounts on the spindle of the crank. A bridge connects the bearing to a handle. The bridge has two legs connected by a transverse spar. Different bridges and handles may be used having different sizes, shapes, lengths and angular orientations which allow the hand pedals to be customized to accommodate a particular user. Hand pedals may also be used on hand cranked bicycles, stationary hand cranked bicycles and industrial equipment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNITED STATES GOVERNMENT AS REPRESENTED BY THE DEPARTMENT OF VETERANS AFFAIRS810 VERMONT AVENUE NW WASHINGTON DC 20420
UNIVERSITY OF PITTSBURGH-OF THE COMMONWEALTH SYSTEM OF HIGHER EDUCATION130 THACKERAY AVENUE 1ST FLOOR GARDNER STEEL CONFERENCE CENTER PITTSBURGH PA 15260

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cooper, Rory A Gibsonia, US 23 205
Gebrosky, Benjamin Gibsonia, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00