Systems and methods for production, storage, and transportation of hydrogen

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12209018
APP PUB NO 20230212004A1
SERIAL NO

17568409

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure refers to systems and methods for the production, storage, and transportation of hydrogen. In a representative embodiment a reactor system comprises a fluidized bed combustor configured for reduced metal oxide oxidation and heat generation without significant greenhouse gas emission and/or with readily capturable emissions. The reactor system also comprises a liquid organic hydrogen carrier dehydrogenation reactor. The fluidized bed combustor is operatively coupled to the liquid organic hydrogen carrier dehydrogenation reactor. Advantageously, at least a portion of heat generated by the fluidized bed combustor may be transferred to the liquid organic hydrogen carrier dehydrogenation reactor. In this manner hydrogen production and transportation is both energy efficient, low carbon intensity and cost-effective.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHEVRON U.S.A. INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Song, Steven Xuqi San Ramon, US 17 28
Yi, Yaofan San Ramon, US 5 4
Zhan, Bi-Zeng San Ramon, US 53 237

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00