Method for manufacturing composite material, and composite material

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12214425
APP PUB NO 20220219233A1
SERIAL NO

17617328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for manufacturing a composite material and composite materials are provided. The method may include preparing a metal foam, preparing a mixture including the metal foam and a curable polymer, curing the curable polymer of the mixture to obtain a composite material, and performing a planarization treatment. The planarization treatment may be performed on the metal foam before preparing the mixture, on the mixture before curing the curable polymer, and/or on the composite material. The composite materials may include a metal foam and a polymer that is on a surface and/or in pores of the metal foam. The composite material may have a surface roughness of 2 μm or less and/or may have a thermal resistance of 0.5 Kin2/W or less at 20 psi.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTDSEOUL 07336

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jin Kyu Daejeon, KR 164 1972
Lee, Yeon Soo Daejeon, KR 46 112
Yoo, Dong Woo Daejeon, KR 39 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00