Integrate structure for damage management of road-bridge transition sections in permafrost regions

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12215467
APP PUB NO 20240410115A1
SERIAL NO

18659853

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an integrated structure for damage management of road-bridge transition sections in permafrost regions, including a plurality of slope surface cooling blocks, a plurality of horizontal equilibrium condensing tubes, and a plurality of cooling flanges and targeting heat pipe arrays. The plurality of slope surface cooling blocks are arranged on the surfaces of the subgrade slope and abutment conical slope; the plurality of horizontal equilibrium condensing tubes are installed inside the abutment-back subgrade; the plurality of cooling flanges are arranged on the side wall of the abutment; the targeting heat pipe arrays are arranged on one side of the subgrade and close to the abutment foundation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NORTHWEST INSTITUTE OF ECO-ENVIRONMENT AND RESOURCES, CHINESE ACADEMY OF SCIENCES

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Dangzhan Gansu, CN 1 0
Wang, Xinbin Gansu, CN 2 0
Yu, Qihao Gansu, CN 5 0
Zhang, Delong Gansu, CN 15 133
Zhang, Zhenyu Gansu, CN 183 901
Zhao, Yaojun Gansu, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00