Bracket assembly for mounting visual perception devices to mobile construction machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12215486
APP PUB NO 20240026652A1
SERIAL NO

17814242

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bracket assembly, for mounting a visual perception device to a structure of a mobile construction machine, includes a first bracket and a second bracket. The first bracket is selectively positionable in a plurality of first positions with respect to the structure. The plurality of first positions is defined around a first axis. The second bracket defines a first portion and a second portion. The first portion is selectively positionable in a plurality of second positions with respect to the first bracket. The plurality of second positions is defined around a second axis. The second portion extends from the first portion. The second portion facilitates a selective positioning of the visual perception device in a plurality of third positions with respect to the second portion. The plurality of third positions is defined around a third axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CATERPILLAR INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Acevedo,, Sr Francisco J Elgin, US 1 0
Guethle, Marcus John Oswego, US 3 5
Ureta, Jahaziel Pérez Apodaca, MX 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00