Optical system including dome light and coaxial light and method for designing optical system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12215853
APP PUB NO 20240210008A1
SERIAL NO

18597336

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of designing an optical system including a dome light and coaxial light, includes: determining a distance between the dome light and the coaxial light based on a radius reduction according to a hole of the dome light; determining a size of the coaxial light based on an optical path of a light ray emitted from the coaxial light; and determining a structure of a printed circuit board (PCB) in the dome light based on an optical path through which the light ray emitted from the coaxial light is reflected by an object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO. LTD.; SEOUL NATIONAL UNIVERSITY R&DB FOUNDATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Hanjin Seoul, KR 3 8
Jang, Jiyong Suwon-si, KR 53 478
Kim, Taeeun Suwon-si, KR 20 235
Kim, Yongsung Suwon-si, KR 65 479
Lee, Byoungho Seoul, KR 37 152
Lee, Siwoo Seoul, KR 8 44
Yoon, Yeoreum Suwon-si, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00