Dual loop blended cooling

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12215907
APP PUB NO 20230168008A1
SERIAL NO

18048318

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thermal management system includes a refrigerant loop including a compressor, a condenser, an expansion element, and a chiller. A first coolant loop of the thermal management system includes the chiller, a first cooling heat exchanger disposed downstream of the chiller, and a distribution valve disposed downstream of the first cooling heat exchanger. A coolant flow path branches from the first coolant loop with the coolant flow path extending from the distribution valve to a re-entry point where the coolant flow path rejoins the first coolant loop at a position downstream of the distribution valve. The coolant flow path includes an electric component, and the distribution valve is configured to control a distribution of the first coolant flowing towards the electric component and the re-entry point.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HANON SYSTEMS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diebel, David Livonia, US 2 6
Lumley, Daniel A Livonia, US 1 0
Papoulis, Evangelos S Northville, US 5 25
Sturos, Reid Howell, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00