Flood control system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12216483
APP PUB NO 20220147071A1
SERIAL NO

17582140

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flood control system for remotely and automatically controlling flooding and water storage on reservoirs. The flood control system generally includes a central computer that controls the water level by controlling or communicating with flow control gates positioned near a number of culverts, wherein each flow control gate typically includes: (a) a control unit communicatively coupled to the central computer, the control unit capable of sending local condition data to the central computer via a wireless connection and further capable of receiving control commands from the central computer; (b) an input/output interface capable of receiving signals or data regarding physical conditions proximate the flow control gate, the input/output interface coupled to the control unit; and (c) a water shutoff valve controllable by the control unit and positioned to selectively allow or block the flow of water through each culvert, wherein each control unit controls each water shutoff valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biffert, Kevin N Horace, US 14 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00