Motor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12218554
APP PUB NO 20230402906A1
SERIAL NO

18452712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor includes a rotor, a stator, a first substrate, a second substrate, and an electronic component arranged at the second substrate. The stator includes a stator core, an insulator, and a coil wound around the stator core via the insulator. The insulator includes a coupling part connected to an external device. The first substrate is fixed to the insulator. The second substrate is fixed to the first substrate. The first substrate and the second substrate are spaced apart in a rotation axis direction of the rotor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MINEBEA MITSUMI INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anko, Masahiko Kitasaku-gun, JP 4 7
Fujie, Yoshihito Kitasaku-gun, JP 2 0
Sakuragi, Katsunori Kitasaku-gun, JP 15 153

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00