Integrated small and medium-sized natural gas steam reforming reactor and reforming reaction process

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12221344
APP PUB NO 20210309516A1
SERIAL NO

17336287

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is an integrated small and medium-sized natural gas steam reforming reactor comprising a furnace body, a combustion module located outside the furnace body, and a conversion reaction module, a steam generation and superheating module, a medium temperature shift module and a desulfurization module arranged inside the furnace body, wherein the combustion module supplies combustion flue gas into an interior of the furnace body, the interior of the furnace body is partitioned into a plurality of flue cavities by a plurality of high-temperature partition plates, and adjacent flue cavities are communicated via gaps between the high-temperature partition plates and an inner wall of the furnace body, thus forming a flue gas channel that zigzags several times; and the flue cavities and the modules arranged therein sequentially form a conversion unit, a steam generation unit, a medium temperature shift unit and a desulfurization unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ALLY HI-TECH CO., LTD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Yeqin Sichuan, CN 5 3
Ye, Genyin Sichuan, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00