Apparatus for gas entrainment via nano-bubbles into concrete upstream from a product mold

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12221392
APP PUB NO 20220380267A1
SERIAL NO

17885263

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for delivering a wet concrete mix to a product mold, where the apparatus comprises a hopper configured to retain a fresh concrete mix, a source of treated water having a concentration of nanobubbles of a gas at least double a natural concentration of nanobubbles of the gas within a natural state of the water, a water transport coupling the source of treated water with the hopper, a valve interposed within the water transport for selectively releasing the treated water into the hopper, and a mixer in communication with the hopper for mixing the treated water with the fresh concrete mix to yield an infused wet concrete.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • COLUMBIA MACHINE INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clark, Jason Portland, US 87 431
Gildersleeve, Stacy Woodland, US 8 5
Goode, Richard T Vancouver, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00