Speed regulation system of a turbine and relevant control method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12221904
APP PUB NO 20240301807A1
SERIAL NO

18573658

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A regulation system (20) of an expansion turbine (3) speed, the system having an organic Rankine cycle system (10) in turn having at least one expansion turbine (3), a control unit (21) which manages all the control processes of the regulation system (20), and regulates the frequency of the electrical energy produced by a generator (4) operating according to a predetermined management logic on one or more of the following components: at least one inlet valve (AV), at least one by-pass valve (BV), an electrical accumulation system (22), a dissipative electrical brake (24), a control of interruptible electrical loads (25) or a system for modulating heat generation or recovery, the predetermined management logic includes a primary regulation that takes place within 10 s and a secondary regulation that takes place in a time between 30 seconds and 30 minutes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TURBODEN S. P. A.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bini, Roberto Brescia, IT 26 104
Gaia, Mario Brescia, IT 25 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00