Dynamic orientation of a physical projection platform

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12222739
SERIAL NO

18386865

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for providing a physical projection routine includes a hardware processor, a system memory storing a software code, and a projection platform. The hardware processor is configured to execute the software code to measure an environmental parameter of a venue, determine, based on the environmental parameter, a desired orientation of the projection platform for executing the physical projection routine, and orient the projection platform according to the desired orientation determined based on the environmental parameter. The hardware processor and software code then execute the physical projection routine by the projection platform oriented using the desired orientation determined based on the environmental parameter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DISNEY ENTERPRISES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Foster, Aaron M Windermere, US 4 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00