Compositions comprising 5-cholesten-3, 25-diol, 3-sulfate (25HC3S) or pharmaceutically acceptable salt thereof and at least one cyclic oligosaccharide

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12226423
APP PUB NO 20230047788A1
SERIAL NO

17852142

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Compositions comprising 5-cholesten-3, 25-diol, 3-sulfate (25HC3S) or pharmaceutically acceptable salt thereof and at least one cyclic oligosaccharide, e.g., a cyclodextrin (CD), are provided. The compositions may be used to prevent and/or treat a variety of diseases and conditions, including organ failure (e.g. acute liver failure), high cholesterol/high lipids, and various inflammatory diseases and conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNITED STATES GOVERNMENT AS REPRESENTED BY THE DEPARTMENT OF VETERANS AFFAIRS810 VERMONT AVENUE NW WASHINGTON DC 20420
VIRGINIA COMMONWEALTH UNIVERSITY800 EAST LEIGH STREET SUITE 3000 RICHMOND VA 23298

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jin Koung Richmond, US 7 12
Lee, Min L Saratoga, US 7 13
Lin, WeiQi Emerald Hills, US 41 636
Miksztal, Andrew R Palo Alto, US 17 78
Ning, Yanxia Richmond, US 3 6
Ren, Shunlin Richmond, US 37 128
Wu, Hongwei Cupertino, US 28 116
Xu, Leyuan Richmond, US 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00