Method for cleaning up oil spills using multi-layered carbon fiber-based absorbents

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227436
APP PUB NO 20230115751A1
SERIAL NO

17496579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for cleaning up oil spills using multi-layered carbon fiber-based absorbents is disclosed. The method for cleaning up oil spills requires an oil-contaminated area including a quantity of oil, a first storage vessel, an oil extraction machine, a heating element, and a multi-layered carbon fiber absorbent. The multi-layered modified carbon fiber absorbent is distributed to the oil-contaminated area, where the multi-layered modified carbon fiber absorbent is configured to extract the quantity of oil from the oil-contaminated area while maintaining hydrophobic. The quantity of oil is extracted and separated from the multi-layered modified carbon fiber absorbent using the oil extraction machine. The extracted quantity of oil is collected into the first storage vessel. The extract quantity of oil is then transferred over to a second storage vessel for later refinement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Khdary, Mohammad Nezar H Riyadh, SA 1 0
Khdary, Nezar Hassan M Riyadh, SA 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00