Energy production loss due to high wind hysteresis control

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228108
APP PUB NO 20230220831A1
SERIAL NO

18009921

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the present invention relate to a computer-implemented method for predicting energy production losses associated with high wind hysteresis control of a wind turbine generator. The method comprises: determining a distribution of wind speeds; determining a high wind hysteresis band that comprises wind speed values between an upper threshold and a lower threshold; and predicting energy production loss due to the high wind hysteresis control. The prediction includes: determining a high wind factor corresponding to a probability that the wind speeds in the hysteresis band occur when the generator is shut off by the high wind hysteresis control, determining, based on the distribution and power data, an energy value associated with the wind speeds falling within the hysteresis band over a predetermined time period; and determining the energy production loss by applying the high wind factor to the determined energy value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berra, Asier Billund, DK 5 1
Block, Jens Kusk Risskov, DK 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00