Sequential propulsion drive

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228190
SERIAL NO

18370856

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sequential propulsion drive assembly is configured to drive a mechanical system. The sequential propulsion drive assembly has a primary output shaft that extends through the motor housing through a forward bulkhead, a central bulkhead, and a rear bulkhead. A collet is joined to a bottom plate and configured to stabilize the primary output shaft. An upper primary shift gear is operatively coupled to the primary output shaft and an upper output gear. An upper electric motor is resting on the central bulkhead and further comprising an upper output shaft. An upper clutch is joined to the upper output gear with an upper clutch. A lower primary shift gear is operatively coupled to the primary output shaft and a lower output gear. A lower electric motor resting on the rear bulkhead and further comprising a lower output shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CROSS RYAN JOSEPHNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cross, Ryan Joseph Tempe, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00