System for transferring condensate

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228333
APP PUB NO 20220390171A1
SERIAL NO

17342024

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

While operating a compressor system equipped with compression train(s), condensate is collected from within stages of the compression train(s), and directed to a blowdown system. Gas from a later stage of the compression train is routed to the blowdown system and used to drive the condensate to a condensate destination at a pressure that avoids flashing of the condensate until it reaches the condensate destination. Inside the blowdown system the condensate is stored in a tank and directed to parallel piped vessels. Operation of the vessels includes (1) receiving the condensate, (2) pressurization with gas from a later stage of compression, (3) flowing the pressurized condensate from the vessel to the condensation destination, (4) depressurizing the vessel, and (5) repeating steps (1)-(4). A flow of condensate from the blowdown system is continuous by staggering the phases of operation between the two vessels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAUDI ARABIAN OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Zahrani, Talal Khobar, SA 12 65
Ansari, Nisar Ahmad Ras Tanura, SA 12 7
Salu, Samusideen Adewale Ras Tanura, SA 34 165
Soliman, Mohamed Ras Tanura, SA 72 954

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00