Vehicle altitude restrictions and control

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228945
APP PUB NO 20230341874A1
SERIAL NO

18341216

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling movement of an unmanned aerial vehicle (UAV) includes controlling one or more propulsion units of the UVA to cause the UAV to operate according to a first set of altitude restrictions; assessing, with aid of the one or more processors and based on one or more criteria, whether to control the UAV to operate according to a second set of altitude restrictions; and controlling the one or more propulsion units to cause the UAV to operate according to the second set of altitude restrictions in response to the one or more criteria being fulfilled according to an assessing result. The first set of altitude restrictions constrain an altitude of the UAV relative to a first reference altitude. The second set of altitude restrictions constrain the altitude of the UAV relative to a second reference altitude.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SZ DJI TECHNOLOGY CO LTDSHENZHEN GUANGDONG 518057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tang, Ketan Shenzhen, CN 43 501
Zhang, Xingyu Shenzhen, CN 49 362
Zhao, Cong Shenzhen, CN 124 1247

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00