Balun

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12230859
APP PUB NO 20230036529A1
SERIAL NO

17938713

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A balun includes: an unbalanced terminal; a first and a second balanced terminals; a first and a second main lines; a first and a second sub-lines; and a first line. The first main line has a first end connected to the unbalanced terminal. The second main line has a first end connected to a second end of the first main line, and a second end that is open. The first sub-line is connected between the first balanced terminal and a reference potential, and is coupled to the first main line. The second sub-line is connected between the second balanced terminal and the reference potential, and is coupled to the second main line. The first line has a first end connected to the midpoint of the first sub-line, and a second end that is open. The first line is coupled to the first main line and the first sub-line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTD10-1 HIGASHIKOTARI 1-CHOME NAGAOKAKYO-SHI KYOTO 6178555 ?6178555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sato, Takuya Kyoto, JP 178 650

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00