Control device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12233717
APP PUB NO 20230331095A1
SERIAL NO

17795510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device for a vehicle is provided with: two drive devices; a first speed reducer that transmits the torque of one drive device to an output shaft; and a second speed reducer that transmits the torque of the other drive device to the output shaft. The control device is provided with a torque control unit that controls, according to a target torque, the torque output by the two drive devices. The torque control unit includes a restriction unit that controls the torque output by the two drive devices when the sign of the target torque is changed from a first sign to a second sign. While outputting torque that reduces the backlash of the first speed reducer or the second speed reducer to one of the drive devices, the restriction unit outputs torque according to the target torque to the other drive device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJI UNIVANCE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inamitsu, Yukihiro Kosai, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00